Projectmanagement, planning, concept and consulting for an upgrade of CA Clarity PPM 7.5.1 to 12.0.1
Based on the current implementation detailed test cases have been developed. Tests have been performed on a prototype upgrade and required adjustments have been identified this way. The planning for all required upgrade steps has been done incl. the hardware migration from Sun Solaris 9 to Red Hat Enterprise Linux 5 (cluster) utilized by a load balancer (new). Another taks was the upgrade to Oracle 10.2.0.4 and a migration of tablespaces.
Management of backoffice resources, coordination with the customers Projectmanagement office and weekly reporting.

Industry: Logistics, Transport (IT)
Role: Senior Consultant PPM, Projectmanager, CA Clarity Expert
Work site: Hamburg, Germany
Software: CA Clarity PPM 12.0.1, Oracle 10g, Sun Solaris, Red Hat Enterprise 5, Windows 2003, VMWare Server 2.0.0, MS Project 2003, OpenWorkbench 1.6, Apache Tomcat 5.5.17, Actuate 9, JDK 1.5.0_11, Clarity Studio
Period: 04/2009 – 08/2009