04/2009 – 08/2009 - Projectmanagement / Consulting PPM - Upgrade CA Clarity 8.1 to 12.0.1 - Red Hat / Oracle
Projectmanagement, planning, concept and consulting for an upgrade of CA Clarity PPM 7.5.1 to 12.0.1
Based on the current implementation detailed test cases have been developed. Tests have been performed on a prototype upgrade and required adjustments have been identified this way. The planning for all required upgrade steps has been done incl. the hardware migration from Sun Solaris 9 to Red Hat Enterprise Linux 5 (cluster) utilized by a load balancer (new). Another taks was the upgrade to Oracle 10.2.0.4 and a migration of tablespaces.
Management of backoffice resources, coordination with the customers Projectmanagement office and weekly reporting.
Industry: Logistics, Transport (IT)
Role: Senior Consultant PPM, Projectmanager, CA Clarity Expert
Work site: Hamburg, Germany
Software: CA Clarity PPM 12.0.1, Oracle 10g, Sun Solaris, Red Hat Enterprise 5, Windows 2003, VMWare Server 2.0.0, MS Project 2003, OpenWorkbench 1.6, Apache Tomcat 5.5.17, Actuate 9, JDK 1.5.0_11, Clarity Studio
Period: 04/2009 – 08/2009